Blog

More units available: gas turbines, combined cycle modules and gensets, 50 and 60 Hz

More units available: 50 and 60 Hz

Gas turbines and plants

  • Fleet of GE Frame 5 gas turbines, 60 Hz, approx. 20 MW class each, dual fuel, overhauled to 0 h before delivery, quantity on request
  • E-class combined cycle modules, approx. 220 MW each, 50 Hz, unused, with complete balance of plant
  • 2 x heavy-duty gas turbines, approx. 130 MW class each, 50 Hz, overhauled to 0 h, gas, distillate or HFO
  • Aeroderivative combined cycle plant, 60 to 70 MW class, 50 Hz, overhauled by the manufacturer, with HRSG and steam turbine

Gensets

  • New diesel gensets, 1.25 MW each, 50 and 60 Hz switchable, with warranty, larger quantities

Prices on request. Next step: your LOI with model and quantity.

Contact: Lothar Schreiner, LKS 360 | manager@lks360.com | WhatsApp +49 170 4656619

Blog